Skip to content
Research Article Peer ReviewedAt least two reviewers Open Access

Sıra Bağımlı Hazırlık Zamanlı Ameliyathane Çizelgeleme için Bir Model Önerisi

1Gazi Üniversitesi
✉ Corresponding author: Melike  Akpınar   · acikgozmelike@gmail.com
PDF BibTeX RIS

References

  1. B. Lahijanian, M.H.F. Zarandi and F.V. Farahani, "Proposing a model for operating room scheduling based on fuzzy surgical duration," 2016 Annual Conference of the North American Fuzzy Information Processing Society (NAFIPS), IEEE, 2016.
  2. A. Macario, "Are your hospital operating rooms “efficient”? A scoring system with eight performance indicators," Anesthesiology: The Journal of the American Society of Anesthesiologists, 105.2 ,2006.
  3. A.Hanset, N. Meskens, and D. Duvivier, "Using constraint programming to schedule an operating theatre," 2010 IEEE workshop on health care management (WHCM), IEEE, 2010.
  4. V. Augusto, X. Xie, and V. Perdomo, "Operating theatre scheduling with patient recovery in both operating rooms and recovery beds," Computers & Industrial Engineering, 58.2, 2010.
  5. Z. Zhao and X. Li, "Scheduling elective surgeries with sequencedependent setup times to multiple operating rooms using constraint programming," Operations Research for health care, 3.3, 2014.
  6. S.N. Ogulata and R. Erol, "A hierarchical multiple criteria mathematical programming approach for scheduling general surgery operations in large hospitals," Journal of Medical Systems,2003, vol.27, no.3.
  7. A. Guinet and S. Chaabane. "Operating theatre planning," International Journal of Production Economics, 85, 2003.
  8. H.Fei, C. Chu and N. Meskens, "Solving a tactical operating room planning problem by a column-generation-based heuristic procedure with four criteria," Annals of Operations Research, 166, 2009.
  9. A.Riise and E.K. Burke, "Local search for the surgery admission planning problem," Journal of Heuristics, 17, 2011.
  10. M.Khambhammettu and M.Persson, "Analyzing a Decision Support System for Resource Planning and Surgery Scheduling," Procedia Computer Science, 100, 2016.
  11. J.P.Arnaout and S.Kulbashian, "Maximizing the utilization of operating rooms with stochastic times using simulation," Proceedings of the 40th conference on winter simulation. Winter Simulation Conference, 2008.
  12. J.P.Arnaout, "Heuristics for the maximization of operating rooms utilization using simulation," Simulation , 2010, vol.86, No.8-9 (2010).
  13. E.Akyol and T. Saraç. "Paralel Makina Çizelgeleme Problemi için bir Karma Tamsayılı Programlama Modeli: Ortak Kaynak Kullanımı," Gazi Üniversitesi Fen Bilimleri Dergisi Part C: Tasarım ve Teknoloji, 5.3, 2017.
  14. Y.H.Lee and M.Pinedo. " Scheduling jobs on parallel machines with sequence-dependent setup times," European Journal of Operational Research, 100, 1997.
  15. A.Jebali, Aida, A.B.H. Alouane and P. Ladet. "Operating rooms scheduling," International Journal of Production Economics, 99, 2006.
Research Contributions (2019+)Peer reviewed by at least two reviewers
Open AccessCC BY 4.0
Open Discovery Metadata · DOI · OAI-PMH
Global Reachresearchers worldwide